Skip to main content

Council Approvals

Complying Development (CDC) Applications

Complying Development Certificate (CDC)

A Complying Development Certificate is the fast-track approval pathway. Where a proposal satisfies every criterion in the Codes SEPP, a council or an accredited private certifier can issue a certificate in as little as two to three weeks - with no merit assessment, no neighbour notification and no discretion. The catch is that "every criterion" is literal. One breach and the pathway closes.

Free consultation

No obligation. We tell you what approval you actually need before you spend anything.

No obligation - first conversation is free.

Typical timeline
2–3 weeks where the project qualifies
Indicative fee
From $2,200 + GST for our package, plus certifier fees
Quoted fixed after a free scope check

The fast-track pathway, and its one condition

The value of complying development is speed and certainty. The condition is absolute compliance. There is no mechanism for a certifier to accept a minor breach, no merit argument, and no negotiation. A structure 150mm too tall is not "substantially compliant" - it is ineligible.

CDC compared with a DA

Complying DevelopmentDevelopment Application
Timeframe2–3 weeks6–10 weeks typical
AssessmentCompliance check onlyMerit assessment
Neighbour notificationNoGenerally yes
Variations possibleNoYes, via Clause 4.6 or DCP justification
Who can issueCouncil or private certifierCouncil only
Refusal riskNone if compliantReal

When a DA is the better choice even though it is slower

If your proposal needs a variation - extra height, a reduced setback, greater floor space - the DA pathway is not a fallback, it is the only pathway. Trying to redesign a good proposal down to fit CDC criteria sometimes costs you more in built outcome than the extra weeks are worth. We will tell you which way that trade-off falls.

How it works

  1. Eligibility check

    2–4 days

    We test the proposal against every applicable Codes SEPP criterion and every constraint on your lot.

  2. Package preparation

    1–2 weeks

    Drawings, BASIX, survey and the technical documentation the certifier requires.

  3. Certification

    2–3 weeks

    Lodged with council or an accredited certifier and managed through to issue.

  4. If it does not qualify

    -

    We tell you immediately and set out the DA pathway, rather than pushing an application that will fail.

What we take off your hands

What EHUP handles

  • A full eligibility check against every Codes SEPP criterion before you commit
  • Preparing the certificate package to certifier standard
  • BASIX, survey and technical documentation required for issue
  • Managing the certifier through to issue
  • Telling you honestly and early when the project does not qualify

What you don't have to deal with

  • Discovering at week three that one criterion fails and starting again as a DA
  • Paying certifier fees on an application that was never eligible

Frequently asked questions

CDC or DA - what is the actual difference?

A CDC is a compliance check: satisfy every criterion and it must be issued, usually in two to three weeks, with no neighbour notification. A DA is a merit assessment: council weighs the proposal, can impose conditions, can approve a variation, and can refuse it - typically over six to ten weeks. CDC is faster and certain; DA is slower and flexible. If your proposal complies in full, CDC is almost always the better choice.

What kinds of projects qualify for a CDC?

Commonly: new dwellings on standard lots, single and double-storey additions, granny flats and secondary dwellings, swimming pools, internal alterations, and many retail, office and food premises fitouts and changes of use. The project type is only the starting point - eligibility turns on the specific criteria being met on your lot.

What stops a project from being eligible?

Heritage listing or a heritage conservation area. Bushfire-prone land in many cases. Flood-affected land. Land subject to certain covenants or environmentally sensitive area classifications. Exceeding any dimensional criterion - height, setback, floor area, landscaped area, site coverage. And in some cases, the zone itself.

Can a private certifier issue it instead of council?

Yes. An accredited certifier can issue a CDC, and that is often faster than going through council. It does not change the criteria - a certifier has no more discretion than council does.

Development Application (DA)

A Development Application is the merit-assessed approval pathway.

Residential Council Approval

Most residential developments do not need a full Development Application.

CDC - Restaurants & Cafes

A cafe or restaurant fitout, and in many cases the change of use to a food premises, can be certified as complying development in as little as two to three weeks where the premises satisfies the Codes SEPP in full.

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
Sydney council areas serviced
14
Point of contact - planning + health, one firm
1

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.