Development in Low/Medium Density Residential (LMR)

Depends on your site

Low and medium density residential development - dual occupancies, manor houses, terraces, townhouses and multi-dwelling housing - sits in the most contested part of the NSW planning framework. Permissibility, minimum lot size, height, floor space ratio and the design criteria all interact, and small differences in lot dimensions change what is achievable. Feasibility before design is where the money is saved.

Free consultation

No obligation. We tell you what approval you actually need before you spend anything.

No obligation - first conversation is free.

Typical timeline
CDC 3–4 weeks where eligible · DA 8–14 weeks
Indicative fee
From $5,500 + GST for a planning package
Quoted fixed after a free scope check

What LMR covers

Dual occupancies (attached and detached), manor houses, terraces, townhouses and other multi-dwelling housing, and residential flat buildings at the smaller end.

Feasibility before design, always

The design criteria are where CDC applications fail

Where complying development is available for low-rise housing, eligibility depends on satisfying a detailed set of design criteria in full - solar access to living areas and private open space, minimum private open space dimensions, articulation, landscaped area, and building separation. They are achievable, but only if designed for from the start.

How it works

  1. Yield feasibility

    3–5 days

    Permissibility, minimum lot size, height and FSR envelope, and the achievable dwelling count.

  2. Pathway assessment

    2–3 days

    Whether complying development is available or a DA is required.

  3. Documentation

    3–5 weeks

    Planning report, design criteria compliance schedule and coordinated specialist reports.

  4. Lodgement

    8–14 weeks

    Managed through determination.

What we take off your hands

What EHUP handles

  • Yield and feasibility assessment against the LEP, DCP and applicable design criteria
  • Confirming whether the complying development pathway is available
  • Planning report and design criteria compliance schedule
  • Coordinating the report stack - survey, stormwater, arborist, waste
  • Lodgement and council liaison

What you don't have to deal with

  • Designing to a yield the controls will not support
  • Buying a lot on the assumption a duplex is achievable

Frequently asked questions

Is a dual occupancy permitted on my lot?

It depends on the zone, the minimum lot size for dual occupancy in your council LEP, and the lot dimensions - frontage matters as much as area in many councils. Two lots of identical area can have different answers. This is a same-day check and it is worth doing before purchase.

What is the difference between a manor house and a dual occupancy?

A dual occupancy is two dwellings on one lot. A manor house is a specific low-rise housing type of four dwellings in a two-storey building, introduced to allow gentle density in medium density zones. They have different permissibility, different lot requirements and different design criteria.

Can these be approved as complying development?

In some cases and in some zones, subject to satisfying the applicable design criteria in full - which are detailed and cover matters like solar access, private open space, articulation and landscaped area. Where the design cannot meet every criterion, a DA is required.

Can I subdivide afterwards?

Subdivision of an approved dual occupancy is possible in some councils and prohibited in others, and where permitted it is a separate application. Whether it is available materially affects the economics, so establish it during feasibility rather than after construction.

Development Application (DA)

A Development Application is the merit-assessed approval pathway.

Complying Development (CDC)

A Complying Development Certificate is the fast-track approval pathway.

Residential Council Approval

Most residential developments do not need a full Development Application.

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
Sydney council areas serviced
14
Point of contact - planning + health, one firm
1

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.