Contaminated Land Assessment (PSI)

Development Application (DA)

If your site has any history of industrial, agricultural chemical or waste-related use, council will likely require a staged contamination assessment before development can proceed - starting with a Preliminary Site Investigation (PSI), which escalates to a Detailed Site Investigation and a Remediation Action Plan only if contamination is actually confirmed. Most sites clear at the PSI stage. We scope the right starting point for your site's history rather than over-ordering the full staged process by default.

Free consultation

No obligation. We tell you what approval you actually need before you spend anything.

No obligation - first conversation is free.

Typical timeline
2–4 weeks for a PSI
Indicative fee
Quoted per site - typically from $2,500 + GST
Quoted fixed after a free scope check

Why the staged approach saves most projects money

The framework is deliberately staged so most sites do not pay for a full detailed investigation unnecessarily - the Preliminary Site Investigation is the filter, and most residential and commercial sites without a flagged industrial history clear at that stage.

Source: State Environmental Planning Policy (Resilience and Hazards) 2021 (NSW), Chapter 4; Contaminated Land Management Act 1997 (NSW).

How it works

  1. History and mapping review

    1–3 days

    Check whether the site sits in a declared investigation area or has a flagged prior use.

  2. Preliminary Site Investigation

    2–3 weeks

    Desktop and site-based assessment of contamination potential from the site's history.

  3. Escalation, if required

    Additional 3–6 weeks if triggered

    A Detailed Site Investigation and Remediation Action Plan are only commissioned if the PSI identifies likely contamination.

What we take off your hands

What EHUP handles

  • Assessing whether your site's history actually warrants a contamination investigation
  • Coordinating the Preliminary Site Investigation and interpreting the findings
  • Managing escalation to a Detailed Site Investigation only where the PSI flags a genuine concern
  • Coordinating a Remediation Action Plan if contamination is confirmed

What you don't have to deal with

  • Commissioning a full detailed investigation when a PSI alone would have cleared the site
  • A DA delayed because a site history flag was missed until council raised it

Frequently asked questions

Does every site need a contamination assessment?

No - it depends on the site's history. Council requires a Preliminary Site Investigation where land sits in a declared investigation area, or where the history suggests possible contamination (a former industrial, agricultural or waste-related use).

What happens if the PSI finds a problem?

A Detailed Site Investigation follows to characterise the extent of contamination, and if confirmed at unsuitable levels, a Remediation Action Plan is prepared setting out how the site will be made suitable for the proposed use.

How long does the staged process take if escalation is triggered?

A PSI alone typically takes 2-4 weeks. If a Detailed Site Investigation and Remediation Action Plan are triggered, add several more weeks - this is exactly why an early history check matters, so it does not surface as a surprise mid-DA.

Is this relevant for industrial sites specifically?

Industrial sites are the most likely to trigger a full staged assessment, given the higher likelihood of a genuine contamination history, but any site - including residential redevelopment of a former commercial lot - can trigger the same requirement.

Geotechnical Report

A geotechnical report investigates the soil, rock and groundwater conditions on your site so a structural engineer can design appropriate foundations - critical on sloping sites, reactive clay soils, or sites with a history of fill or contamination.

Commercial & Industrial Approval

Commercial and light industrial projects span a wide range - from a cafe fitout that can be certified in two to three weeks, to a warehouse development where the capital at risk makes feasibility the first priority, not documentation.

Specialist Reports

Most applications of any size need reports from specialists outside town planning.

Why clients choose EHUP

Years in NSW planning & environmental health
10+
Approvals lodged and managed
250+
Sydney council areas serviced
14
Point of contact - planning + health, one firm
1

Not sure which approval you need?

Tell us the address and what you want to do. We'll help identify the appropriate planning pathway, whether it is exempt development, complying development or a full DA. Your first conversation is free.